Estimate the concrete needed for a set of steps by treating each step as its own small slab, then adding up the totals.

Concrete needed
1.36 yd³
36.7 ft³
80 lb bags
62
≈ $403.00
Ready-mix cost
$237.65
delivered estimate

How this calculator works

Concrete volume is calculated as Length × Width × Thickness for rectangular slabs and footings, or π × radius² × depth for round columns and footings. Thickness is entered in inches and converted to feet (divide by 12) before multiplying, since length and width are measured in feet.

The result in cubic feet is divided by 27 to convert to cubic yards (27 ft³ = 1 yd³), which is how ready-mix concrete is sold and priced. A waste allowance (typically 5–10%) is added to cover spillage, uneven subgrade, and over-excavation.

For bagged concrete, the total volume (including waste) is divided by the yield of a single bag: an 80 lb bag yields about 0.6 ft³, a 60 lb bag about 0.45 ft³, and a 40 lb bag about 0.3 ft³ of mixed concrete.

Example calculation

Project: a 10 ft × 10 ft patio slab, 4 inches thick, with a 10% waste allowance.

  • Volume = 10 × 10 × (4 ÷ 12) = 33.3 ft³
  • With 10% waste = 33.3 × 1.10 = 36.7 ft³
  • Cubic yards = 36.7 ÷ 27 = 1.36 yd³
  • 80 lb bags needed = 36.7 ÷ 0.6 ≈ 62 bags

At roughly $6.50 per 80 lb bag, that’s about $400 in bagged concrete — or around $175–$200 delivered per yard (≈$240–$270 total) if you order ready-mix instead, which is usually cheaper and faster for anything over 1 cubic yard.

Buying & material guidance

For pours under about 1 cubic yard, bagged concrete mixed on-site is usually more practical than ordering ready-mix (most concrete companies have a minimum order, often 1 yard or more, plus a short-load fee below that). For anything larger — driveways, large patios, foundations — ready-mix delivered by truck is almost always cheaper per yard and far less labor.

Always round up to the nearest full bag or, for ready-mix, round up to at least the next quarter-yard — running short mid-pour means a cold joint and a weaker slab. Standard concrete mixes (3000–4000 PSI) are fine for most residential slabs; driveways and areas exposed to freeze-thaw cycles typically call for 4000 PSI or air-entrained mix.

This calculator doesn't have a dedicated stair shape, but steps are easy to estimate accurately with the rectangular slab mode: run the calculator once per step, using that step's tread length, width, and riser height as the thickness, then add up the cubic yards and bags across all steps. Add a 10% waste allowance per step since hand-forming stair edges creates more spillage than a flat slab.

This tool uses the same calculation engine as our full Concrete Calculator, with guidance tailored to this project type.

Frequently asked questions

How do I calculate concrete for stairs?+

Treat each step as its own rectangular slab — its tread length × width × riser height — and run the calculator once per step, then add the results together. This is more accurate than trying to estimate the whole staircase as one shape.

How much concrete do I need for a 10x10 slab?+

For a 10 ft × 10 ft slab at the common 4-inch thickness, you need about 1.23 cubic yards before waste, or roughly 1.35 cubic yards with a 10% waste allowance — about 62 bags of 80 lb concrete mix.

How many 80 lb bags of concrete make a yard?+

One 80 lb bag yields about 0.6 cubic feet of mixed concrete. Since a cubic yard is 27 cubic feet, it takes about 45 bags of 80 lb concrete mix to make one full cubic yard.

Should I use ready-mix or bagged concrete?+

As a rule of thumb, bagged concrete is more cost-effective for pours under 1 cubic yard. For larger pours, ready-mix delivered by truck is typically cheaper per yard and requires far less manual mixing labor.

How much waste allowance should I add?+

Most contractors add 5–10% extra to account for spillage, uneven or over-excavated subgrade, and minor form leaks. Complex shapes or hand-dug footings often warrant closer to 10%.

How much does a concrete slab cost per square foot?+

Ready-mix concrete alone typically runs $5–$7 per square foot installed for a standard 4-inch slab, including basic labor and finishing. Material cost alone (just the concrete) is usually $2–$3 per square foot. Decorative finishes, reinforcement, or site prep can push the total well above this range.

How thick should a concrete slab be?+

4 inches is standard for patios, walkways, and shed floors. Driveways for cars typically need 4–6 inches (6 inches or more if heavier vehicles will use it), and footings are usually sized separately based on local building code and frost depth requirements.

How many yards of concrete do I need for a driveway?+

A typical single-car driveway (about 10 ft × 20 ft) at 4 inches thick needs roughly 2.5 cubic yards before waste. A two-car driveway (20 ft × 20 ft or larger) can need 5–7 cubic yards or more — plug your exact dimensions into the calculator above for a precise figure.

Is it cheaper to mix my own concrete or order ready-mix?+

For pours under about 1 cubic yard, bagged concrete mixed on-site is usually cheaper once you account for ready-mix minimum-order and short-load fees. Above 1 cubic yard, ready-mix is almost always cheaper per yard and dramatically less labor, since mixing that much concrete by hand or with a small mixer is impractical.